Review the building
Start with a free phone consultation, then use photos, video, building records, or a FaceTime walk-through to narrow the likely entry zones.
Commercial wildlife work at building scale
Commercial bat inspection, exclusion, and matched entry-point repair for high-rise and difficult-access properties. Project inquiries are accepted in every state except Alaska.

Specialized scope
The visible opening is only one part of the job. A workable plan connects wildlife activity with facade conditions, exterior access, occupied areas, repair materials, and the order in which the building should be closed.
A building-wide plan for letting bats leave, preventing re-entry, and closing elevated access points in the right sequence.
Explore service 02Focused investigation of reported activity, likely travel paths, elevated gaps, and the access conditions that shape the repair plan.
Explore service 03Targeted closure of identified facade and roofline gaps after the exclusion sequence and access plan are established.
Explore service 04Inspection and exclusion planning for commercial properties where access, operations, and occupant communication matter.
Explore serviceField conditions
Real project photography shows the access, positioning, and repair work behind a complete high-rise exclusion plan.



The project sequence
Most projects begin by phone and move to a FaceTime assessment, photo review, or site visit. That early work establishes the access plan, price range, and repair sequence before a crew travels.
Typical projects range from $10,000 to $75,000. A 10 percent deposit holds the crew and mobilization schedule.
Start with a free phone consultation, then use photos, video, building records, or a FaceTime walk-through to narrow the likely entry zones.
Choose the access method, provide a working price range, collect the 10 percent deposit, and schedule the travel crew.
Seal inactive gaps, install custom one-way doors at active openings, and return after the exit period to remove the devices and finish the repairs.
Commercial terms
High-rise bat work is quoted around the building, access method, amount of repair, and travel required. Most sealing phases take three to seven days. Custom one-way doors stay in place while the colony exits, usually over three to five nights, and the crew returns to remove the devices and finish the repair.
The warranty covers bat re-entry anywhere in the building except through open windows and doors. Extended coverage does not require a new inspection.
Property types
High-rise and commercial properties need an approach that respects occupants, operations, access limits, and the building envelope.
Multi-unit properties where resident communication, balconies, upper-floor reports, and shared exterior systems shape the work.
Property guidanceGuest-facing buildings where discretion, scheduling, and a clear response plan are essential.
Property guidanceComplex facilities that require careful access planning and coordination with building and safety teams.
Property guidanceTall commercial buildings with curtain wall, masonry, mechanical, and roofline details that may require specialized access.
Property guidanceMulti-building environments that benefit from consistent documentation and a repeatable property-wide response.
Property guidanceLarge buildings where roof edges, wall transitions, louvers, and active work zones affect inspection and repair access.
Property guidanceWhat property teams notice first
None of these details proves where bats are entering. Together, they can show where a more focused inspection should begin.
Read the full warning-sign guideReports that line up around the same corner, floor, joint, louver, or roof transition.
A recurring pattern can point to an exterior route or connected cavity that needs a wider review.
Open joints, damaged screening, and small gaps at elevated material transitions may warrant inspection.
An isolated patch may not address repeated details or nearby openings along the same elevation.
Field proof
Hospitals, apartments, universities, and historic properties rarely want a bat problem attached to their name. These case studies keep the technical detail and withhold the client identity.
Historic masonry
A rappel inspection traced bat activity to openings in the stone and mortar of 375-foot bell towers.
Historic cathedralRead the project profileOccupied healthcare property
An estimated 150 to 250 bats entered surgery and recovery areas after earlier pest-control attempts had failed. The colony outside the hospital was likely much larger than the number reaching those interior spaces.
HospitalRead the project profileCorrective exclusion work
A previous contractor sealed a historic luxury apartment building's exterior before the colony had left, trapping bats inside the walls of an occupied property.
Historic luxury apartmentsRead the project profileLong elevated opening
The crew rappelled to an inaccessible platform and treated a 300-linear-foot gap with one-way doors placed about every 15 feet, with zero reported callbacks over the following three years.
University facilityRead the project profileProperty manager field notes
Short, building-focused guides for documenting activity and preparing for inspection.
What property teams can observe and document before requesting a closer exterior inspection.
6 min readGuide / 02A practical intake checklist for property managers, engineers, and facilities teams.
6 min readGuide / 03A facade-focused overview of the joints, transitions, and elevated details that may warrant inspection.
7 min readGuide / 04Typical project pricing, the 10 percent deposit, the full project sequence, and what the two-year warranty covers.
7 min readGuide / 05Why flightless pups change the schedule, how Florida's permit rule works, and what to do before the season starts.
7 min readStart with the building
Share the building location, reported activity, and known access conditions. We will use that information to prepare the right first conversation.