Typical project pricing, the 10 percent deposit, the full project sequence, and what the two-year warranty covers.

Typical projects range from $10,000 to $75,000

Height alone does not set the price on a commercial project. The range depends on how much of the building envelope is actively involved, the access method the site requires, the repair materials used, travel for the crew, the number of drops or lift positions needed to cover the work, and how much of the schedule has to be built around keeping the property operating normally.

A single, well-defined opening on an easily accessible wall sits toward the lower end of that range. A long or multi-story elevation with several access positions and occupied space to work around sits toward the higher end. A property with more than one active elevation, or with repairs needed in several separate zones, should expect an estimate closer to a fully scoped project than a single flat number.

The deposit schedules the crew

A 10 percent deposit holds the crew's schedule and travel plan. Before that point, the process starts with a free phone consultation and typically moves to a FaceTime site assessment, using photos, video, building plans, or a live walkthrough to establish a working price range.

The deposit is what turns that estimate into a scheduled project. From there, the crew mobilizes, and the sealing portion of the work is usually completed over three to seven days depending on the size and complexity of the building.

What the warranty covers

Completed projects include a two-year, no-fault warranty. If bats re-enter the building during that period, the return visit is covered, with one exception: entry through an open window or door is not treated as a covered re-entry, since that is a building-operations issue rather than an exclusion failure.

Brett reported an overall callback rate of roughly 1 to 2 percent and said commercial projects run lower than cabin work. That is not a guarantee for any individual property, but it reflects how the two-year warranty has performed across completed projects.

The full project sequence, start to finish

The same nine-step sequence applies to every commercial project, though the schedule around each step changes based on the building.

  • Free phone consultation
  • FaceTime site assessment
  • Initial price range provided
  • 10 percent deposit collected
  • Travel crew mobilized
  • Sealing work completed, typically three to seven days
  • Custom one-way doors installed after the other sealing work
  • Colony allowed to exit over roughly three to five nights
  • Return visit about one week later to remove the doors and finish the patches

How the price range becomes a fixed scope

The initial price range given after the phone consultation and FaceTime assessment is a starting point, not a final number. Once the crew has a closer look, whether through additional photos, a site visit, or the access review itself, the scope firms up into a specific proposal. Projects rarely move outside the original range by a wide margin, but the exact number depends on what the access review actually finds once work begins.

Comparing a bid on more than price

A lower bid that skips the FaceTime assessment, does not mention one-way doors, or does not describe a warranty is not necessarily a better deal. Ask specifically what access method is planned, whether the deposit is 10 percent or something else, how many days the sealing phase is expected to take, and what the warranty covers before comparing two numbers side by side.

Why access method affects the estimate more than square footage

Two buildings of similar size can carry very different price ranges. A building with a single accessible elevation and a nearby anchor point for a lift is a more straightforward project than one that needs a rope system, several drop positions, or travel to a site far from the crew's home base. Access method and travel are often bigger cost drivers than the raw size of the building.

What can push a project toward the higher end

A few factors tend to move a project estimate up: a longer or taller active elevation, an access method that requires rope work instead of a standard lift, repair materials that need to match a historic or specialty facade, and scheduling constraints on an occupied building that limit when the crew can work. None of these are unusual on commercial properties. They are simply part of why an initial price range, rather than a fixed number, is provided before the site assessment.

Guano cleanup is available as an add-on when a project calls for it, though it is a smaller part of the overall scope on most commercial jobs and is scoped separately from the exclusion work itself.

Extended coverage after year two

Once the standard two-year warranty ends, extended coverage is available for approximately $500 per year. No new inspection is required to renew it, which makes it a straightforward add for a property that wants ongoing protection against re-entry without scheduling a fresh site visit every year.

Travel and scheduling

Because the crew travels to the site rather than working from a fixed local office, mobilization timing is part of the estimate conversation from the start. A property with a flexible start window sometimes has more scheduling options than one that needs the work finished by a fixed date.